1. Alashwal, A.M. and M.Y. Chew. 2017. Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5): 534-545. [
DOI:10.1108/BEPAM-11-2016-0058]
2. Aruga, K., J. Sessions and A.E. Akay. 2005. Application of an airborne laser scanner to forest road design with accurate earthwork volumes. Journal of Forest Research, 10(2): 113-123. [
DOI:10.1007/s10310-004-0116-9]
3. Aruga, K., J. Sessions and A.E. Akay. 2005. Heuristic planning techniques applied to forest road profiles, Journal of Forest Research, 10: 83-92. [
DOI:10.1007/s10310-004-0100-4]
4. Bi, X., Z. Chen and L. Li. 2015. A New Algorithm for the Risk of Project Time Based on Monte Carlo Simulation. In Proceedings of the 21st International Conference on Industrial Engineering and Engineering Management 2014. Atlantis Pres, 463-466. [
DOI:10.2991/978-94-6239-102-4_93]
5. Easa, S. 2003. Estimating Earthwork Volumes of Curved Roadways-Simulation Model. Journal of Surveying Engineering, 129(1): 19-27. [
DOI:10.1061/(ASCE)0733-9453(2003)129:1(19)]
6. Ghajar, I., A. Najafi, A.M. Karimimajd, K. Boston and S. AliTorabi. 2013. A program for cost estimation of forest road construction using engineer's method. Forest Science and Technology, 9(3): 111-117. [
DOI:10.1080/21580103.2012.759163]
7. Isaksson, T. and H. Stille. 2005. Model for estimation of time and cost for tunnel projects based on risk evaluation. Rock Mechanics and Rock Engineering, 38(5): 373-398. [
DOI:10.1007/s00603-005-0048-5]
8. Jada, k.h. and S. Rozbehi. 2015. Project Risk Management Using PertMaster, Kian University Press, Tehran, Iran, 640 pp (in Persian).
9. Ji, Y., A. Borrmann, E. Rank, J. Wimmer and W. Günthner. 2009. An Integrated 3D Simulation Framework for Earthwork Processes, In: Proc. of the 24th CIB-W78 Conference on Managing IT in Construction, Istanbul, Turkey. 29-36.
10. Kochenderfer, J.N., G.W. Wendel and H.C. Smith. 1984. Cost of and soil loss on" minimum-standard" forest truck roads constructed in the central Appalachians. Res. Pap. NE-544. Broomall, PA: US Department of Agriculture, Forest Service, Northeastern Forest Experiment Station, 8 pp. [
DOI:10.2737/NE-RP-544]
11. Kwak, Y.H and L. Ingall. 2007. Exploring Monte Carlo simulation applications for project management. Risk Management, 9(1): 44-57. [
DOI:10.1057/palgrave.rm.8250017]
12. Layton, D.A. 1990. Forest road construction cost equations for the central Appalachians. PhD Thesis, West Virginia University, Virginia, USA, 180 pp.
13. Li, J.Y., S.J. Zhou and Y.C. Li. 2005. Real estate portfolio mode based on information entropy. Journal of Hebei Institute of Architectural Science and Technology, 22(2): 76-80.
14. Liu, X and Y. Wang. 2004. Evaluation and control of the lead -time risk of the system integration project with risk transfer algorithm. Operations research and management science, 1: 38-43.
15. Niazi, A., J.S. Dai, S. Balabani and L. Seneviratne. 2006. Product cost estimation: Technique classification and methodology review. Journal of Manufacturing Science and Engineering, 128(2): 563-575. [
DOI:10.1115/1.2137750]
16. Pazhouhan, I., A. Najafi, A.K. Rouhani and J. Vahidi. 2017. Effect of Subsurface Materials on Earthwork Operation Costs of Forest Road. European Journal of Forest Engineering, 3(2): 44-51.
17. PMI. 2004. A guide to the project management body of knowledge (3rd edition). Newtown Square, PA: Project Management Institute, 216 pp.
18. PMI. 2008. A guide to the Project Management Body of Knowledge (4rd edition). Newtown Square, PA: Project Management Institute, 460 pp.
19. Shahbaznia, M. and S.A. Taleghani. 2010. Simulate the time and cost of the project with Monte Carlo, 06th National Congress on Civil Engineering, Semnan university, Semnan, Iran.
20. Shirmohammadi, H. 2015. Project control and management, Arkan pres, Tehran, Iran, 41 pp (in Persian).
21. Špačková, O., J. Šejnoha and D. Straub. 2013. Tunnel construction time and cost estimates: from, Prague, Czech Republic, 8(8).
22. Tan, J. 1992. Planning of forest road networks by a spatial data handling-network routing system. Acta Forestalica Fennica, 227: 1-85. [
DOI:10.14214/aff.7673]
23. Zhou, F.M., M.Y. Zhang and Y.B. Yuan. 2011. Risk of Project Time Based on PCA-GA-BP. Journal of Engineering Management, 5: 14-18.